Product Details:
Payment & Shipping Terms:
|
Type: | Lithium Iron Phosphate | Cycle Life: | 2000-5000Times |
---|---|---|---|
Application: | Electric Two-wheeled Tricycle | Capacity: | 280A Or Customized |
Standard Voltage:: | 3.2V | Oem: | Acceptable,Welcome,Yes |
Size: | 72*174*204mm | Weight: | 5.5kg |
Highlight: | 3.2V 280A Lithium Iron Phosphate Battery,Camper LiFePO4 Lithium Iron Phosphate Battery,3.2V 280A Camper Battery Pack |
Product Specification | |
Product Name | Factory direct supply lithium iron phosphate battery 3.2V280A |
Nominal Voltage | 3.2V |
Nominal Capacity | 280A |
Standard Charge Current | 10A |
Max Charge Current | 20A |
Charge Cut-off Voltage | 3.65V |
Standard Discharge Current | 140A |
Max Cont Discharge Current | 280A |
Discharge Cut-off Voltage |
2V |
Material | NMC battery ( or LiFePO4 battery, |
Cell/ Brand | lithium iron phosphate battery |
Cell Type | Factory direct supply lithium iron phosphate battery |
Temperature Range | Charge temperature: 0°C to 45°C |
Discharge temperature: -20°C to 55℃ | |
Storage temperature: -20°C to 55℃ | |
Life Cycle | More than 2000cycles |
Package Material | Shrinked PVC |
Certification | ROHS, UN38.3, MSDS, IEC62133, CB |
Key Words | Electric bicycle Electric bicycle Moped Scooter |
Delivery Time:
- Material Preparation Time: 7-15 days (or inventory)
- Production & Assembly Time 3-10 days
- Testing & Packaging Time: 2-10 days
- Total Delivery Time: 30-45days
- The faster delivery could be negotiable.
OEM/ODM Service:
If you want to display your own brand logo in products, bags, labels or anywhere. Or you need to develop battery packs according to your product orientation. Our OEM and ODM services are ready to do it.
Packing:
According to Stardard Export Packing.
Carton box, wooden box, wooden pallet
Guanyuestablished in Shenzhen on July 18, 2005, mainly in the business of battery packs. In 2009 the company passed ISO9001 and improved the product quality standard to fulfill the high-end requirements from our customers.
In 2012, Guanyu moved to a new facility and expend the production capacity, the Productivity improved nearly 10 times than before.
In 2013, Guanyu imported ERP (SAP) system to supervise order execution process.
In 2017, Guanyuexpanded the SMT, imported high-speed patch machine from Germany.
Until now the factory grows into a modern enterprise which integrated injection molding, PCB designing, SMT and battery pack assembling services.
In 2018 the company passed ISO14001certification, introduced automated battery production line to further improve the production quality and capacity.
Contact Person: Mr. Zhang
Tel: +86-15013633680