Product Details:
Payment & Shipping Terms:
|
Type: | Lithium Iron Phosphate Battery | Cycle Life: | ≥2500times |
---|---|---|---|
Application: | Outdoor Camper | Capacity: | 50A 100A Or Customized |
Standard Voltage:: | 12V | Oem: | Acceptable,Welcome,Yes |
Size: | 120*120*160mm | Weight: | 5kg |
High Light: | Lithium Iron Phosphate Battery 12V 50A,Custom Lithium Iron Phosphate Battery Pack,12V 50A Energy Storage Battery Pack |
About company:
* Guanyu has 15 years experience of battery packs. Our customers are from all over the world.
* Develop products according to customer requirements or product orientation.
* The automated battery assembly line can process 7K-10K cells every day to guarantee fast delivery for the orders.
* Offer 200 test points for the battery within 60V 10A and 32 test points for the battery within 100V 20A.
* SAP & MES dual system to coordinate daily production.
Product specification
No. | content | Testing method | Remark |
1 | Charge cut-off voltage |
14.6V | |
2 | Discharge cut-off voltage |
8V | |
3 | Standard charge | Under the condition of the ambient temperature of 25±2℃,Charge the battery at constant current of 0.2C to reach 14.6V. Then charge the battery at constant 14.6V voltage until the charging current decreasing to 0.02C. |
|
4 | Standard discharge | After the standard charging , rest for 1 hour then discharge to 8V@0.2C. |
|
5 | Shipments voltage | 12-14V | capacity ≤30 % |
6 | Maximum Charge Current | ≤5A | |
7 | Maximum continuous working current |
≤50A | |
8 | Rated capacity | Typical capacity:50A Minimum capacity:49A |
standard discharge after standard charge |
9 | Operation temperature range | charging:10~45℃ humudity:60±25% discharging:-20~60℃ |
60±25%R.H |
10 | Storage temperature | ≤1 month: -20 ~ 45℃ ≤3 months: 0 ~ 30℃ ≤1 year: 0 ~ 30℃ |
10~25℃ 60±25%R.H Best 10~25℃ for long-time storage |
Delivery Time:
- Material Preparation Time: 7-15 days (or inventory)
- Production & Assembly Time 3-10 days
- Testing & Packaging Time: 2-10 days
- Total Delivery Time: 30-45days
- The faster delivery could be negotiable.
FAQ
The first quarter. Can I order samples?
A. Yes, we welcome sample orders to test and check the quality.
Q1. What about the lead time?
A. It takes 3 days for samples and 5-7 weeks for mass production, depending on the order quantity. Q3. Do you have any MOQ restrictions?
A. Yes, we have a MOQ for mass production, which depends on different part numbers. Can provide 1~10 sample orders. Low MOQ, can provide 1 sample for inspection.
Q2. How do you ship the goods and how long will it take to arrive?
A. It usually takes 5-7 days to arrive. Air and sea transportation are also optional.
Q3. How to process the order?
A. Let us know your requirements or applications first. Secondly, we quote according to your request or our suggestion. Third, the customer confirms the samples and pays a deposit to make a formal order. Fourth, we arrange production.
Contact Person: Mr. Zhang
Tel: +86-15013633680